The four entries in Category 1 are:

71 Central Westgate Sky Walk

Entrant: GeoMetal Limited (Design & Engineering)

Location: Nonthaburi, Thailand.   Completed: 24 August 2015

Client: Central Pattana Public Company Limited

Team: Pasalandscape Company Limited, Fastech Company Limited, Project Planing Public Company Limited, Power Line Engineering Public Company Limited, Fastech Company Limited

0071-1
0071-10
0071-2
0071-3
0071-4
0071-5
0071-6
0071-7
0071-8
0071-9
01/10 
start stop bwd fwd

1262 Perth Children's Hospital

Entrant: Fabritecture (Designer and Installer)

Location: Subiaco, WA.   Completed: July 30 2015

Client: John Holland Group

Team: JCY Architects, Greenup Design International, Fabritecture, Textile Fabrication Services, Fabritecture

1262_001
1262_002
1262_003
1262_004
1262_005
1262_006
1262_007
1262_008
1262_009
1262_010
1262_011
1262_012
1262_013
1262_014
1262_015
1262_016
1262_017
1262_018
1262_019
1262_020
01/20 
start stop bwd fwd

1290 Canteen Canopy Extension

Entrant: SEMF Pty Ltd (Architect / Engineer)

Location: Ringwood, Victoria.   Completed: 31 July 2016

Client: Aquinas College

Team: SEMF, SEMF, Walsh Industries (Steel), Horizon Sailmakers (Membrane & cables)

1290_01
1290_02
1290_03
1290_04
1290_05
1290_06
1290_07
1290_08
1290_09
1290_10
1290_11
1290_12
01/12 
start stop bwd fwd

1434 Mary McKillop College Amphitheatre

Entrant: Shade And Membrane Structures Australia (Design / Project Management / Install)

Completed: May 8 2014

Client: James Trowse Constructions

Team: Opus Architecture, Osborn Lane, James Trowse Constructions, Shadecom

1434-01
1434-02
1434-03
1434-04
1434-05
1434-06
1434-07
1434-08
1434-09
1434-10
1434-11
1434-12
01/12 
start stop bwd fwd

The Entries for Category 2 (Medium Structures) are:

72 Ocean Supercenter

Entrant: GeoMetal Limited (Design & Engineering)

Location: Ocean Supercenter, Myanmar, Thailand.   Completed: January 2016

Client: Capital Properties

Team: Process Architect & Planner Co., Ltd., Fastech Company Limited

0072-1
0072-2
0072-3
0072-4
0072-5
0072-6
0072-7
1/7 
start stop bwd fwd

492 Shop With Me Mobile Pop Up

Entrant: Tensys Engineers Pty Ltd (Engineer)

Location: Chicago / New York / Dallas / Las Vegas / San Jose.   Completed: 2014

Client: with me. com

Team: Giorgio Borruso Design, Mendenhall Smith/Tensys, Fabritec Structures LLC Xtreme Manufacturing LLC

0492_SWM_1
0492_SWM_2
0492_SWM_3
0492_SWM_4
0492_SWM_5
0492_SWM_6
1/6 
start stop bwd fwd

1293 Hornsby Aquatic Seating Covered Areas

Entrant: Shade And Membrane Structures Australia (Design / Project Management / Install)

Location: Hornsby, NSW.   Completed: April 30 2014

Client: ADCO Constructions / Hornsby City Council

Team: Peter Hunt Architects, Larry Shyu Global Membrane Design, ADCO Constructions, Shadecom / Fabric Solutions

1293-01
1293-02
1293-03
1293-04
1293-05
1293-06
1293-07
1293-08
1293-09
1293-10
1293-11
1293-12
1293-13
1293-14
1293-15
1293-16
1293-17
1293-18
1293-19
01/19 
start stop bwd fwd

1429 Little Edward Street Atrium Roof

Entrant: Shade And Membrane Structures Australia (Design / Project Management / Install)

Completed: December 5 2013

Client: Bennelong Funds Management

Team:  Global Membrane Design, SAMA, Shadecom / Fabric Solutions

1429-01
1429-02
1429-03
1429-04
1429-05
1429-06
1429-07
1429-08
1429-09
1429-10
1429-11
1429-12
1429-13
1429-14
1429-15
1429-16
1429-17
1429-18
1429-19
1429-20
1429-21
01/21 
start stop bwd fwd

2047 Laneways Canopy

Entrant: Fabric Structure Systems (Designer / Fabricator / Installer)

Location: Whangarei, New Zealand.   Completed: April 2016

Client: Whangarei District Council

Team: Wade Design Engineers Ltd, Fabric Structure Systems, Fabric Structure Systems, Culum Engineering (Steel)

HERO SHOT for Awards Laneway 06
Laneways 01
Laneways 02
Laneways 03
Laneways 04[4]
Laneways 05
1/6 
start stop bwd fwd

2063 Elizabeth Quay

Entrant: Fabritecture (Designer and Installer)

Location: The Esplanade.   Completed: August 20 2015

Client: Leightons

Team: ARM Architects, Maffeis Engineering, Fabritecture, Seele, Fabritecture

2063_001
2063_002
2063_003
2063_004
2063_005
2063_006
2063_007
2063_008
2063_009
2063_010
2063_011
2063_012
2063_013
2063_014
2063_015
2063_016
2063_017
2063_018
2063_019
2063_020
01/20 
start stop bwd fwd

2114 Pacific Fair Porte Cochere

Entrant: Fabritecture (Designer and Installer)

Location: Broadbeach, QLD.   Completed: Feb 29 2016

Client: Scentre Group (Westfield)

Team: Scentre Group (Westfield), Wade Design, Fabritecture, Textile Fabrication Services, Fabritecture

2114_001
2114_002
2114_003
2114_004
2114_005
2114_006
2114_007
2114_008
2114_009
2114_010
2114_011
2114_012
2114_013
2114_014
2114_015
2114_016
2114_017
2114_018
2114_019
2114_020
01/20 
start stop bwd fwd

2245 Jim Stynes Bridge

Entrant: Aurecon (Engineer)

Location: Docklands, Victoria.   Completed: June 18, 2014

Client: State Government of Victoria and City of Melbourne

Team: Cox Architects, Aurecon, Oculus (Landscape), Cox Architects (Urban Design), Electrolight, Architecture & Access, RPS Project Management, Aurecon, Fitzgerald Constructions, Fitzgerald Constructions, Focus Engineering

2245-01
2245-02
2245-03
2245-04
2245-05
2245-06
2245-07
2245-08
1/8 
start stop bwd fwd

2697 Catholic College Bendigo

Entrant: Structureflex (Designer / Engineer)

Location: Junortoun, Bendigo.   Completed: December 2015

Client: Catholic College Bendigo

Team: Y2 Architects, Steve Huppert, John Killmister (Cert. Eng), Shade Living Pty Ltd, Glarfab (membranes), Thornton Engineering (steel)

2697_CCB_01
2697_CCB_02
2697_CCB_03
2697_CCB_04
2697_CCB_05
2697_CCB_06
1/6 
start stop bwd fwd

2698 St Joseph's College Netball Court

Entrant: Structureflex (Designer / Engineer)

Location: Echuca, Victoria.   Completed: January 2015

Client: St Joseph's Catholic College

Team: Y2 Architects, Steve Huppert, John Killmister (Cert. Eng), Shade Living Pty Ltd, Fabric Solutions (membrane), Thornton Engineering (steel)

2698_SJCE_01
2698_SJCE_02
2698_SJCE_03
2698_SJCE_04
2698_SJCE_05
1/5 
start stop bwd fwd

The entries in the Shadecloth category are:

1332 Sea World Polar Bear Enclosure

Entrant: Shade And Membrane Structures Australia (Design / Project Management / Install)

Location: Sea World.   Completed: December 1, 2013

Client: Village Roadshow Theme Parks

Team:  Osborn Lane / Global Membrane Design and Alliance Design Group, Astute, Shadecom

1332 - 1
1332 - 10
1332 - 11
1332 - 12
1332 - 13
1332 - 14
1332 - 15
1332 - 16
1332 - 17
1332 - 18
1332 - 19
1332 - 2
1332 - 20
1332 - 21
1332 - 3
1332 - 4
1332 - 5
1332 - 6
1332 - 7
1332 - 8
1332 - 9
01/21 
start stop bwd fwd

3225 Piara Waters

Entrant: Fabritecture (Designer and Installer)

Location: Armadale, WA.   Completed: July 30 2014

Client: McCorkell Constructions

Team: Donovan Payne Architects, Greenup Design International, Fabritecture, Fabric Solutions Australia

3225_001
3225_002
3225_003
3225_004
3225_005
3225_006
3225_007
3225_008
3225_009
3225_010
3225_011
3225_012
3225_013
3225_014
3225_015
3225_016
3225_017
3225_018
3225_019
3225_020
01/20 
start stop bwd fwd

The Entries in Category 4 (Large Structures) are:

74 Central Westgate Ceiling

Entrant: GeoMetal Limited (Design & Engineering)

Location: Nonthaburi, Thailand.   Completed: 24 August 2014

Client: Central Pattana Public Company Limited

Team: MAAR, Fastech Company Limited, Project Planing Public Company Limited, Power Line Engineering Public Company Limited

0074-1
0074-10
0074-11
0074-2
0074-3
0074-4
0074-5
0074-6
0074-7
0074-8
0074-9
01/11 
start stop bwd fwd

4047 Hagley Oval - Cricket Pavilion

Entrant: Fabric Structure Systems (Designer / Fabricator / Installer)

Location: Christchurch, New Zealand.   Completed: October 2014

Client: Cantebury Cricket Association

Team: Athfield Architects, Wade Design Engineers Ltd, Southbase, Fabric Structure Systems

1. Hagley view from pitch centre
2. Hagley long view to canopy
3. Hagley view along seating
4. Hagley view under canopy from pitch
5. Hagley Internal Mast
6. Hagley SIDE
1/6 
start stop bwd fwd

4114 Pacific Fair Resort Roof

Entrant: Fabritecture (Designer and Installer)

Location: The Esplanade.   Completed:

Client: Scentre Group (Westfield)

Team:  Scentre Group (Westfield), Wade Design, Textile Fabrication Services, Fabritecture 

4114_001
4114_002
4114_003
4114_004
4114_005
4114_006
4114_007
4114_008
4114_009
4114_010
4114_011
4114_012
4114_013
4114_014
4114_015
4114_016
4114_017
4114_018
4114_019
4114_020
01/20 
start stop bwd fwd

4771 Queensland State Velodrome

Entrant: MakMax Australia (Engineer, Fabricator, Installer)

Location: Sleeman Sports Complex, Brisbane.   Completed: August 2016

Client: Watpac

Team: Cox Rayner Architects, Tensys, Arup, MakMax Australia

4771_01
4771_02
4771_03
4771_04
4771_05
4771_06
4771_07
4771_08
4771_09
4771_10
4771_11
4771_12
01/12 
start stop bwd fwd

4773 Chevron Renaissance

Entrant: MakMax Australia (Engineer, Fabricator, Installer)

Location: Gold Coast, QLD. 

Team: MakMax Australia

4773_01 Chevron
4773_02 Chevron
4773_03 Chevron
4773_04 Chevron
4773_05 Chevron
4773_06 Chevron
4773_07 Chevron
4773_08 Chevron
4773_09 Chevron
1/9 
start stop bwd fwd

The entry in Category 5 (Glazing and Vertical Facades) is:

50 Martin Place - Glass Roof

Entrant: Taylor Thomson Whitting (Engineer)

Location: 50 Martin Place, Sydney.   Completed: Unknown

Client: Macquarie

Team: Johnson Pilton Walker, Taylor Thomson Whitting, Brookfield Multiplex, Sharvain Pacific Steel

5047_01
5047_02
5047_03
5047_04
5047_05
5047_06
1/6 
start stop bwd fwd