Moet & Chandon

Entrant: Taiyo Membrane Corp (MakMax)
Client: Moet & Chandon Australia
Architect: Chris Bosse (PTW)
Structural Engineer: Xiang Du (TMC)
Fabricator(s): Taiyo Membrane Corp

4001 A  4001 B

Very lightweight highly curved forms may be used to create exciting geometric forms to fill a void.

There will be no external environmental loads from wind, rain or snow but a small degree of prestress and accurate patterning are required.

28,15,0,50,1
600,600,60,1,5000,1000,25,2000
90,300,1,50,12,25,50,1,70,12,1,50,1,1,1,5000
Internal 10
View Image
Internal 09
View Image
Internal 01
View Image
Internal 02
View Image
Internal 03
View Image
Internal 04
View Image
Internal 05
View Image
Internal 06
View Image
Internal 07
View Image
Internal 07
View Image

Australian Catholic University Artwork & Fall Arrest Netting

Tensys Engineers Pty Ltd (Engineer)

Location: Fitzroy, Victoria.   Completed: 2015

Client: Australian Catholic University

Team: Amy Watson (Artist), Tensys Engineers, Turner & Townsend Thinc (Proj Man.), Shape Australia, Ronstan

Tower House Netting

Tensys Engineers Pty Ltd (Engineer)

Location: Fitzroy, Victoria.   Completed: 2014

Client: Philip & Sophia Ross

Team: Áustin Maynard Architects, Maurice Farrugia & Assoc, Tensys – net design & details, Oxley Nets (net) McDonald Marine (ropes), Overend Constructions Pty Ltd

Snow Globe Xmas Pavilion

Aurecon (Engineer)

Location: IFC Shopping Mall, Hong Kong.   Completed: November 2014

Client: Elite Showcase Ltd, Hong Kong

Team: Elenberg Fraser, Aurecon, Eliye Showcase Ltd, Hong Kong

The RAIA Bar

Entrant:            MakMax Australia – Designer
Location:           Melbourne Convention & Exhibition Centre – Melbourne
Client:              The Australian Institute of Architects
Architect:          LAVA
Struct. Eng.:      MakMax Australia
Others:             MakMax (Installation)
Fabricator:         MakMax Australia