- 1. Shadecloth Structures
- (Category)
- ... South Africa and other regions. Since the increased awareness of UV related issues, there has been many shade panels installed in playgrounds and schools. There is a larger number of contractors operating ...
- Created on 22 July 2015
- 2. Makmax Carra Stadium Contract
- (Member News)
- Gold Coast Stadium Redevelopment MakMax has been awarded the fabric roofing contract for the $144.2 million Gold Coast Stadium Redevelopment at Carrara, Queensland. The Queensland Government led Gold ...
- Created on 22 February 2015
- 3. Christchurch Stadium to Proceed
- (Industry News)
- ... arena, Te Kaha, to $683 million, entering into a fixed price design and construction contract with lead contractor BESIX Watpac. Populus are bringing their stadium design expertise to the project. The ...
- Created on 30 August 2022
- 4. New Allianz Stadium (2022) Opens in Sydney
- (Stadiums)
- ... release can be viewed at https://www.allianzstadium.com.au/articles/allianz_stadium_official_open Some other links are: Wikipedia Article which describes the contractual story in some detail: https://en.wikipedia.org/wiki/Sydney_Football_Stadium_%282022%29 ...
- Created on 30 August 2022
- 5. Fabric Structures Ltd NZ
- (Member Profiles)
- ... engineers, leading fabric suppliers, steel fabricators, local civil contractors and professional riggers. Based in New Zealand, Fabric Structures Ltd specialises in the design and fabrication of bespoke architectural and event ...
- Created on 12 May 2022
- 6. Noosa Botanical Gardens (2021 DA Entry 4563)
- (Small Fabric Structures)
- ... consideration the natural shade provided by the surrounding tree canopy to eliminate direct sunlight from entering the shade garden. Council contracted consultants along with our team to perform a holistic ...
- Created on 21 March 2022
- 7. M Pavilion 2021 Sun Shade/Sail (2021 DA Entry 1857)
- (Small Fabric Structures)
- ... Project Client M Pavilion / Naomi Milgrom Foundation Project Architect MAP Studio (Venice) Structural Engineer Tensys /AECOM Building Contractor Schiavello Fabricator(s) 3Dinflate ...
- Created on 21 March 2022
- 8. Sharjah Safari - Birds of Africa Aviary (DA 2021 Entry 4657)
- (Large Fabric Structures)
- ... This project started prior to Covid 19 but continued through and use of VC and feedback from the local contractor was vital in getting this project off the ground COSTS 4,000,000 PROJECT CREDITS ...
- Created on 21 March 2022
- 9. Spanish Pavilion at Dubai Expo 2020 (4726)
- (Large Fabric Structures)
- ... the local contractor was vital in getting this project off the ground COSTS 1,000,000 PROJECT CREDITS Project ID 4726 Project Name Dubai Expo 2020 – Spain Pavilion ...
- Created on 21 March 2022
- 10. 2374 Green School Pods - New Plymouth, NZ
- (Medium Fabric Structures)
- APPLICATION OF PROJECT: 3 Pod like classrooms at Green School NZ PROJECT DESCRIPTION: To provide an outer skin from a material that can be recycled if/when replaced and also blends into ...
- Created on 18 March 2022
- 11. Special Applications - 1996 Awards
- (1996 Design Awards)
- The following Special Application project was entered and received a Citation of Merit 1352 News Ltd – Louvre Wall Rod Support The administration block to the complex required an elegant shade ...
- Created on 22 February 2022
- 12. Wellington Square (Moort-ak Waadiny) Playground Shade Structures
- (Spaceframes, Cablenets, Glazing)
- ... installation of the cables, mesh and decorative shade elements by the successful main contractor, Advanteering Civil Engineers. The Ronstan scope included the close coordination of our requirements ...
- Created on 16 February 2022
- 13. Flinders University Pedestrian Bridge Upgrade (2021 DA Entry 2082)
- (Footbridges)
- ... Entrant Type / Role Other; Specialist Building Subcontractor Design and Construct Project Client Flinders University Project Architect Cox Architecture ...
- Created on 16 February 2022
- 14. MLC School - Senior Centre (2022 DA Entry 5134)
- (Facades)
- ... Website Address www.ronstantensilearch.com Entrant Type / Role Sub Contractor Project Client MLC School Project Architect BVN Architects ...
- Created on 16 February 2022
- 15. Green School - New Plymouth, NZ (2021 DA Entry)
- (Medium Fabric Structures)
- APPLICATION OF PROJECT: 3 Pod like classrooms at Green School NZ PROJECT DESCRIPTION: To provide an outer skin from a material that can be recycled if/when replaced and also blends into environment. ...
- Created on 07 February 2022
- 16. St Margaret's Velarium Retractable Shade System, Ascot, QLD (DA 2021 Entry
- (Special Applications)
- ... of steelwork and specific erection sequences were all coordinated with the head contractor and our partner subbies. Our extensive education industry experience means the design always progressed to best ...
- Created on 04 February 2022
- 17. Canopy at Rosenthal Ave, Lane Cove (DA 2021 Entry)
- (Small Fabric Structures)
- ... playgrounds, parks and landscaping, entertainment areas, retail services such as Coles and ALDI, BBQ’s, and amenities. Fabritecture was contracted for the design & construction of an ETFE pneumatic ...
- Created on 04 February 2022
- 18. Navigation Park Shade Structure Tarneit, VIC (DA 2021 Entry)
- (Small Fabric Structures)
- ... to an innovative tensegrity structural system. DESIGN / FABRICATION / INSTALLATION BRIEF Tasked by the landscaping contractor with creating a bespoke shade structure for the Navigation Park in ...
- Created on 04 February 2022
- 19. Wigley Reserve Playground Structure (DA 2021 Entry)
- (Small Fabric Structures)
- ... area integrated within the reserve, drawing on inspiration from the sand dunes that once inhabited the region. DESIGN / FABRICATION / INSTALLATION BRIEF Fabritecture was contracted for the design ...
- Created on 04 February 2022
- 20. M6 Community Recreational Facility, Rockdale, NSW (DA 2021 Entry)
- (Medium Fabric Structures)
- ... to provide shade to the community in various areas including McCarthy and Brighton Reserve. As part of the McCarthy Reserve upgrade, Fabritecture was contracted for the design and construction of eight ...
- Created on 04 February 2022