LSAA
Not for Profit Professional Association dealing with Architectural Fabric Structures, large span roofs, cablenets, facades, glazing and other innovative structures

Total: 51 results found.

Search for:
Search Only:

Page 1 of 3

1. 2018 Design Awards
(Category)
...  7431 D'Arenberg Winery Cube Umbrellas. 7432 Perth Stadium Arbour Walk  7627 Somewhere Other – Venice Biennale Structure         [High Commendation] 7700 Dual Skin Safety Net System   The ...
Created on 09 October 2018
2. Dual Skin Safety Net Structure at MLC (2018)
(Special Applications)
  Application: Innovative architectural alternative to Safety Hoarding for the construction industry Project entered in the LSAA 2018 Design Awards (Cat 7 Special Applications, #7700) PROJECT DESCRIPTION: ...
Created on 17 October 2018
3. Updated Australian Standards for fire safety
(Industry News)
Important revisions have taken place for fire detection and control in buildings across a number of Standards. These set out the minimum requirements that should be in place during design and construction ...
Created on 21 February 2016
4. Swimming Pool Safety Barrier Standard
(Industry News)
Australian Standard for Swimming Pools A new Australian Standard AS 1926.1-2012 "Swimming pool safety - Safety barriers for swimming pools" has just been released. The objective of this Standard is ...
Created on 22 February 2015
5. Noosa Botanical Gardens (2021 DA Entry 4563)
(Small Fabric Structures)
... with Tenara PTFE thread 316 marine grade stainless steel toggles and cabling Laser cut aluminum disk plates Safety chain links from sail to column FABRICATION All Fabrication of steelwork ...
Created on 21 March 2022
6. Flinders University Pedestrian Bridge Upgrade (2021 DA Entry 2082)
(Footbridges)
... for a period of time due to safety, forcing students to face either a challenging walk down through the darkened ravine at night or a lengthy bus ride, the bridge route had been one of the university’s ...
Created on 16 February 2022
7. St Margaret's Velarium Retractable Shade System, Ascot, QLD (DA 2021 Entry
(Special Applications)
... required prechamber of cantilever steel truss members. With safety at the forefront of our design for education sector projects, the St Margaret’s pool roof has been engineered to withstand sudden wind ...
Created on 04 February 2022
8. CommBank Stadium, Sydney (2021 DA Entry)
(Stadiums)
... the safety of working at heights, and the hanging fabric before and during installation underneath the steelwork. We devised an innovative solution for the underslung fabric installation, using cradle ...
Created on 03 February 2022
9. Ken Rosewall Arena, Sydney (2021 DA Entry)
(Large Fabric Structures)
... reduce the ‘big lift’. Preassembly on the ground made installation faster and reduced the temporary engineering requirements. This in turn improved the safety conditions on site. The Client also benefited ...
Created on 03 February 2022
10. SpecTex21 Sydney July 2021
(Other Events)
... evolving in NSW, STA’s Council of Management have made the very difficult decision to postpone SpecTex21.   The health and safety of our exhibitors, attendees and staff is a priority for STA, as is delivering ...
Created on 24 March 2021
11. Gale Pacific Products Endorsed by the Cancer Council
(Member News)
... and offer UV protection. Fully tested according to AS4174 by the Australian Radiation Protection and Nuclear Safety Agency, GALE Pacific’s shade fabrics deliver a high level of UVE protection. See the ...
Created on 09 December 2020
12. New Perth Optus Stadium Tensile Membrane Roof (2018)
(Stadiums)
... the large volume of roof drainage water expected. Reducing working at height was a key focus for the team from a safety in design perspective and a construction planning focus. Arup’s steel design drove ...
Created on 13 October 2018
13. HOTA Home of the Arts Outdoor Stage Project (2018)
(Collaboration - Iconic Projects)
... safety of construction. Arup worked closely with the design and client team, contractor, steel fabricator and shop detailer to ensure buy-in from all parties to the canopy construction sequence and methodology ...
Created on 13 October 2018
14. QUT Sports Field Car Park Project (2018)
(Large Fabric Structures)
... from the slab within the building during construction. 800m2 of stainless steel fall arrest wire mesh was used around the base of the structure. The mesh was designed as a safety mechanism to ensure ...
Created on 13 October 2018
15. Hyper Coaster Queueing Canopies Project (2018)
(Entrances and Canopies)
... required craning completed structures over the roller coaster and so co-ordination with park management was required to enable out of hours work for both patron safety and also to assist in maximum productivity ...
Created on 12 October 2018
16. Knox Grammar School Project (2018)
(Medium Fabric Structures)
... cranes were required to lift materials over walls and into position. Working in a school environment safety had to be taken very seriously. Work times were limited to out-of-school hours and holidays when ...
Created on 12 October 2018
17. Australian Cladding & Building Standards Summit
(Industry News)
... at the following webpage, from which the text below is extracted with acknowledgement. Event Details - Agenda and Booking "2017 was a tragic turning point for the construction and safety industry with ...
Created on 03 May 2018
18. NCC 2019 Available for Public Comment
(Industry News)
... a separate document produced by the ABCB that may assist in the area of fire issues in larger membrane structures. It is called the "Fire Safety Verification Method proposed for NCC 2019" and can be found ...
Created on 11 February 2018
19. 2018 National Construction Code Seminars
(Past Events)
... One Amendment 1, which relates to fire safety requirements. NCC 2019 public comment draft. The improved CodeMark Australia scheme. A practical development and assessment of Performance Solutions. ...
Created on 01 October 2017
20. European Guidance for the Structural Design of Tensile Membrane Structures
(Industry News)
... and to achieve a harmonized safety level. This background document consists of three major parts: (a) general explanations giving scientific and technical background for the design of membrane structures, ...
Created on 29 August 2017
  • 1
  • 2
  • 3
  • You are here:  
  • HOME

Back to Top

© 2022 LSAA